Our client, a global insulation manufacturer, required accurate and accessible technical information in order to build trust with architects, specifiers and contractors.
To support assessment under the Code for Construction Product Information (CCPI), TMPR updated 54 product datasheets across 11 product sets. This formed part of our wider support across the company’s extensive technical literature library, which also included creating a new 179-page searchable Fire-stopping Standard Details Guide and managing six versions of regularly updated digital and printed price lists.
TMPR coordinated the complex projects across multiple product teams, designers, approvers and external suppliers.
Each project required rigorous quality control, detailed stakeholder coordination and delivery against fixed regulatory, product-launch or commercial deadlines.
The result was a fully assessed product range, a new technical guide downloaded more than 10,000 times within its first six months and a dependable process for keeping important customer information accurate, accessible and up to date.
Challenge
As expectations around building safety and construction product information continued to rise, the manufacturer wanted to ensure that customers could access clear, accurate and trustworthy technical information.
The Code for Construction Product Information (CCPI) provides third-party assessment of product information, helping manufacturers demonstrate robust standards and build greater confidence among architects, specifiers and contractors. Achieving assessment across the manufacturer’s full UK and Ireland product range therefore required a comprehensive review of its technical literature.
Its large and frequently evolving literature library included product datasheets, specification guides, installation guidance, packaging and price lists. Updating these materials was not simply a design exercise: every detail needed to be technically accurate, approved by the relevant product teams and delivered against immovable deadlines.
Three projects demonstrated the scale and complexity of this ongoing requirement.
The company needed to update its full UK and Ireland datasheet library before a CCPI assessment deadline, create an entirely new fire-stopping guide alongside a major product launch and manage recurring price-list changes across digital and printed formats.
Solution
For the CCPI project, TMPR coordinated the update of 54 datasheets covering 11 product sets, carrying out detailed quality checks and working closely with the client’s project and product managers to secure approvals before submission.
All 54 datasheets successfully passed assessment. At the time, this represented the broadest set of construction products assessed for a single manufacturer.
TMPR also supported the creation of a new technical fire-stopping guide following customer feedback and the development of a next-generation product range. Rather than update the previous document, we helped build a new 179-page resource from the ground up.
We coordinated the design of its templates, title sheets, section pages and covers; organised technical details by application; mapped an intuitive navigation structure; and introduced searchable content and interactive links to help users find relevant information quickly.
Alongside these major projects, TMPR manages recurring updates to six versions of the manufacturer’s price lists. This includes artwork changes, interactive digital functionality, supporting marketing visuals, print preparation and distribution to three locations across the UK and Ireland.

Outcomes
The entire UK and Ireland product range passed CCPI assessment before the required deadline, providing independent verification of the manufacturer’s commitment to clear, accurate and trustworthy product information.
The new technical fire-stopping guide was completed ahead of its October 2025 launch and received more than 10,000 downloads by March 2026. Its searchable and interactive format made an extensive collection of technical details easier for specifiers to navigate and use.
All six price-list versions were also approved and delivered on schedule. Interactive editions were published four weeks before the effective date, while printed versions reached each required location in advance.
Together, these projects demonstrate TMPR’s ability to manage compliance-critical technical content at scale, combining strategic oversight with detailed delivery to ensure complex information reaches customers accurately and on time.
“This was a complex, time-sensitive project with a clear business goal – to ensure the client’s UK and Ireland product range was ready for CCPI assessment by the required deadline.
“Our understanding of the CCPI requirements, coupled with rigorous quality assurance and close coordination across multiple teams, enabled us to manage updates to 54 datasheets without compromising accuracy or consistency.
“The successful assessment of the entire range gave the client independent verification of the quality and reliability of its product information, helping strengthen trust with key stakeholders. It also demonstrated the value of having an experienced delivery partner that could manage significant technical detail and maintain momentum against demanding timescales.”